File #: 2023-5385    Name:
Type: Public Hearing - Sworn Status: Withdrawn
File created: 1/6/2023 In control: Planning Commission
On agenda: 5/11/2023 Final action: 5/16/2023
Title: Continued Public Hearing: Application #PL2022-394 - Rezoning from PMIX and PI to PI and Preliminary Development Plan - Summit 470 Logistics Center, 1451 NW Main Street; Ryan Companies US, Inc., applicant. (Note: This item was continued from April 4, 2023. This has application has been withdrawn by the applicant.)
Sponsors: Development Services
Attachments: 1. Staff Memo, 2. Summit 470 Logistics Traffic Memo, 3. Staff Report, 4. PC Action Report (3/9/23), 5. Rezoning Exhibit, 6. Transportation Impact Analysis, 7. Trip Generation Memorandum, 8. Preliminary Development Plan, 9. Preliminary Storm Drainage Study, 10. Building Elevations, 11. Neighborhood Meeting Minutes, 12. Unimproved Road Policy, 13. Location Map
Title
Continued Public Hearing: Application #PL2022-394 - Rezoning from PMIX and PI to PI and Preliminary Development Plan - Summit 470 Logistics Center, 1451 NW Main Street; Ryan Companies US, Inc., applicant.
(Note: This item was continued from April 4, 2023. This has application has been withdrawn by the applicant.)

Body
Issue/Request:
The applicant proposes a rezoning and preliminary development plan for a two-lot industrial development. Lot 1 will be the site of a 465,000 sq. ft. logistics center building. Lot 2 has no building proposed at this time. Under the proposed rezoning to PI (Planned Industrial), the future development of Lot 2 will not require going through a separate public hearing process in front of the Planning Commission and City Council. The UDO allows for the development of PI-zoned property to be approved at the staff level as long as the proposed development complies with all UDO standards. An application for the future development of Lot 2 would only be presented to the Planning Commission and City Council if the applicant were to request a modification seeking relief from any UDO requirement.
Architecturally, the proposed Lot 1 building will be constructed of pre-cast concrete panels. Color banding will provide horizontal relief. Additional painted concrete panels will be spaced out on all four building sides to provide vertical relief. These additional panels will have 12” of overlap in order to provide some projection to break up the large expanses of wall.

Proposed Planning Commission Motion:
I move to recommend APPROVAL of Continued Appl.#PL2022-394 - REZONING from PMIX to PI and PRELIMINARY DEVELOPMENT PLAN - Summit 470 Logistic Center, 1451 NW Main St; Ryan Companies US, Inc., applicant.

Presenter
Andy Crimmins, Applicant Representative
Josh Johnson, AICP, Director of Development Services

Recommendation
Recommendation: With the conditions of approval below, the application meets the requirements of the UDO and Des...