File #: 2022-5011    Name:
Type: Public Hearing - Sworn Status: Presented
File created: 6/17/2022 In control: City Council - Regular Session
On agenda: 7/26/2022 Final action: 7/26/2022
Title: Public Hearing: Application #PL2022-159 - Rezoning from CP-2 to PI and Preliminary Development Plan - 950 NE Pollard Street; Engineering Solutions, LLC, applicant.
Sponsors: Planning and Special Projects
Attachments: 1. Draft PC Minutes, 2. Staff Report, 3. Transportation Impact Analysis, 4. Rezoning Exhibit, 5. Preliminary Development Plan, 6. Colored Elevations, 7. Macro Storm Water Drainage Study, 8. Neighborhood Meeting Notes, 9. Location Map, 10. Applicant Presentation, 11. Staff Presentation
Related files: 2022-5036, 2022-5047, BILL NO. 22-150
Title

Public Hearing: Application #PL2022-159 - Rezoning from CP-2 to PI and Preliminary Development Plan - 950 NE Pollard Street; Engineering Solutions, LLC, applicant.

Body

Issue/Request:

The applicant proposes to rezone the subject property from CP-2 to PI and includes a preliminary development plan for a proposed 9,750 sq. ft. office/warehouse building on the 1.31-acre site.  A specific user has yet to be determined for the site.

A modification is sought to not require construction of a 54’ segment of the required sidewalk along NE Pollard St from the eastern driveway to the eastern property boundary.  The applicant further requests that payment in lieu of construction of said sidewalk portion also not be required.  Staff supports not requiring construction of the sidewalk segment, but does not support waiving payment in lieu of construction.

Presenter

Matt Schlicht, P.E., Applicant's Representative

Josh Johnson, AICP, Assistant Director of Plan Services

Recommendation

Recommendation: With the conditions of approval below, the application meets the requirements of the UDO and DCM (Design and Construction Manual).

1.                     A modification shall be granted to the requirement for a sidewalk along the entire street frontage along a commercial or industrial street, to not require construction of the sidewalk segment (approximately 54’ in length) east of the easternmost driveway serving the site.  Payment in lieu of construction for said segment shall be required.

2.                     Development shall be in accordance with the preliminary development plan dated May 23, 2022, and building elevations with revised dates of May 24, 2022, subject to conditions further contained below.

3.                     To satisfy the requirements of the UDO, all sides of the building shall include similar architectural details, materials and colors to minimize a back-side presentation to other buildings.

4.                     To sat...

Click here for full text