File #: 2020-3786    Name:
Type: Public Hearing - Sworn Status: Passed
File created: 11/6/2020 In control: Planning Commission
On agenda: 11/12/2020 Final action: 11/12/2020
Title: Public Hearing: Application #PL2020-304 - PRELIMINARY DEVELOPMENT PLAN - Lee's Summit High School exterior materials, 400 SE Blue Pkwy; Gould Evans, applicant
Sponsors: Planning and Special Projects
Attachments: 1. Staff Report, 2. Building Elevations, 3. Site Plan and Exterior Building Images, 4. Metal Panel Exhibit, 5. Location Map

Title

Public Hearing: Application #PL2020-304 - PRELIMINARY DEVELOPMENT PLAN - Lee's Summit High School exterior materials, 400 SE Blue Pkwy; Gould Evans, applicant

 

Body

Issue/Request:

Lee’s Summit High School is slated to undergo a façade renovation and building addition project.  The proposed improvements include an extensive use of architectural metal panels as a primary exterior material.  The use of metal as a primary exterior material on a non-residential building located outside of an industrial area requires approval as a conditional material via a preliminary development plan application.  The scope of the subject application is limited to the consideration of architectural metal panels as a primary exterior building material.

 

Proposed Planning Commission Motion:

I move to APPROVE Appl. #PL2020-304 - PRELIMINARY DEVELOPMENT PLAN - Lee's Summit High School exterior materials, 400 SE Blue Pkwy; Gould Evans, applicant.

 

Presenter

Hector Soto, Jr., AICP, Planning Manager

Steve Vukelich, Representative for Gould Evans

 

Recommendation

Recommendation: With the condition of approval below, the application meets the requirements of the UDO.

 

1.                     Architectural metal panels shall be allowed as a primary exterior building material as shown on the building elevations dated September 4, 2010.