File #: BILL NO. 20-108    Name:
Type: Ordinance Status: Passed
File created: 5/21/2020 In control: City Council - Regular Session
On agenda: 6/9/2020 Final action: 6/9/2020
Title: An Ordinance authorizing the execution of an engineering contract (RFQ 2020-025) by and between the City of Lee’s Summit, Missouri and HDR Engineering, Inc. for the Wastewater Master Plan in the amount of $485,030 and authorizing the City Manager to enter into the same. (PWC 6/1/20)
Sponsors: Water Utilities
Attachments: 1. Ordinance, 2. Exhibit A - LS Master Plan Fee, 3. Exhibit B - LS Wastewater Master Plan 2020, 4. Exhibit C - Contract
Related files: 2022-4722
Title
An Ordinance authorizing the execution of an engineering contract (RFQ 2020-025) by and between the City of Lee’s Summit, Missouri and HDR Engineering, Inc. for the Wastewater Master Plan in the amount of $485,030 and authorizing the City Manager to enter into the same. (PWC 6/1/20)
Body
Issue/Request:
Award of RFQ 2020-025 and execution of an engineering contract for the creation of a new Wastewater Master Plan.

Key Issues:
-The existing most recently completed Wastewater Masterplan for the City of Lee’s Summit was completed in 2006 and based on data collected from 1996-2006.
-It is good practice to update these planning documents to ensure alignment with growth patterns and City goals.
-An RFQ was issued for the Wastewater Master Planning Document.
-The submittals were reviewed and HDR Engineering Inc received the highest scores for their expertise and project approach
-The attached contract was negotiated and works within the budget approved in the existing Capital Improvements Program

Proposed City Council Motion:
FIRST MOTION: I move for a second reading of an Ordinance authorizing the execution of an engineering contract (RFQ 2020-025) by and between the City of Lee’s Summit, Missouri and HDR Engineering, Inc. for the Wastewater Master Plan in the amount of $485,030 and authorizing the City Manager to enter into the same.
SECOND MOTION: I move for adoption of an Ordinance authorizing the execution of an engineering contract (RFQ 2020-025) by and between the City of Lee’s Summit, Missouri and HDR Engineering, Inc. for the Wastewater Master Plan in the amount of $485,030 and authorizing the City Manager to enter into the same.
Background:
Water Utilities is made up of two utility systems the water system and wastewater system each of these systems needs to be designed to carry the required flows for the City as it currently exists and as it will exist in the future. The planning for these systems is handled through master plans for each ...