File #: 2019-2573    Name:
Type: Public Hearing - Sworn Status: Agenda Ready
File created: 2/7/2019 In control: City Council - Regular Session
On agenda: 3/5/2019 Final action:
Title: Public Hearing: Application #PL2018-121 and Application #2018-231 - Preliminary Development Plan and Special Use Permit for indoor climate controlled storage facility - Attic Storage of Lee’s Summit, 920 NE Deerbrook Street; Strickland Construction Co., applicant.
Sponsors: Planning and Special Projects
Attachments: 1. Planning Commission Minutes, 2. Staff Letter, 3. Transporation Analysis, 4. Preliminary Development Plan, 5. Elevations, 6. Applicant Narrative, 7. Request for modification, 8. Preliminary Development Plan Criteria, 9. Neighborhood Sign-In Sheet, 10. Protest to Application, 11. Adjacent Property Pictures, 12. Location Map, 13. Memo to Council, 14. Applicants Presentation
Title
Public Hearing: Application #PL2018-121 and Application #2018-231 - Preliminary Development Plan and Special Use Permit for indoor climate controlled storage facility - Attic Storage of Lee’s Summit, 920 NE Deerbrook Street; Strickland Construction Co., applicant.
Body
Issue/Request:
The applicant proposes a preliminary development plan and special use permit for an indoor climate controlled storage facility located at 920 NE Deerbrook St., located north of the existing Genesis Fitness Center, at the NE corner of NE Mulberry St. and M-291 Hwy. The property is an infill vacant, platted lot zoned CP-2 (Planned Community Commercial District).
The facility is comprised of one (1) indoor climate controlled building totaling 583 units. The color palette and materials for the proposed building includes brick and stone masonry, in red and browns, and light brown stucco finished wall panels. Spandrel opaque glass, clear glass windows, and metal canopies are also proposed.
The indoor facility is a drive-through facility where the customer can enter the building with their car or truck and unload to a nearby elevator. The anticipated operation hours for the storage facility office are from Monday through Friday, 9 a.m. to 6:00 p.m.; tenants will have 24/7 access, by way of the security gate. In addition, limited office space is proposed on the third floor, consisting of approximately 3,394 sq. ft.
A modification is requested for the floor area ratio (FAR). Staff supports the requested modification.
The applicant requests a 25 year time period for the special use permit. Staff supports the requested time period.
-101,400 square feet - one (1) building
-47.6% proposed overall impervious coverage - 80% maximum recommended impervious coverage
-52.4% proposed overall open area - 20% minimum recommended open area
-0.92 proposed overall FAR - 0.55 maximum allowed FAR in the CP-2 district
-16 parking spaces required - 18 parking spaces provided

Presenter
Josh...

Click here for full text