File #: 2018-2176    Name:
Type: Public Hearing - Sworn Status: Failed
File created: 7/20/2018 In control: City Council - Regular Session
On agenda: 11/6/2018 Final action: 11/6/2018
Title: Remanded Appl. #PL2018-084 and Appl. #2018-085 - Preliminary Development Plan and Special Use Permit for indoor climate controlled storage facility - Extra Space Lee’s Summit, 700 SE Oldham Court; Hernly Associates, Inc., applicant.
Sponsors: Planning and Special Projects
Attachments: 1. 10-25-18 PC minutes (draft), 2. Staff Letter, 3. Transportation Impact Analysis, 4. Site Survey, 5. Preliminary Development Plan, 6. Elevations, 7. Landscape Plan, 8. Special Use Permit Criteria, Comprehensive Narrative, and Additional Special Conditions Narrative, and Modification Requests provided by Applicant, 9. Photometric Plan, 10. photo of surrounding area, 11. photo of surrounding area, 12. photo of surrounding area, 13. photo of surrounding area, 14. Action Letter from the July 24, 2018 Planning Commission meeting, 15. Action Letter from the August 9, 2018 City Council meeting, 16. Action Letter from the August 23, 2018 City Council meeting, 17. Location Map
Title
Remanded Appl. #PL2018-084 and Appl. #2018-085 - Preliminary Development Plan and Special Use Permit for indoor climate controlled storage facility - Extra Space Lee’s Summit, 700 SE Oldham Court; Hernly Associates, Inc., applicant.

Body
Issue/Request:
Extra Space was originally recommended for approval by the Planning Commission at the July 24, 2018 meeting. City Council, during its August 9, 2018, meeting recommended to advance the application to the second ordinance reading for final approval. Subsequently, at the August 23, 2018, meeting, the City Council remanded the application back to the Planning Commission in order for the applicant to address concerns regarding architecture and to reduce the number of requested modifications to the Unified Development Ordinance (UDO). The applicant has since revised and resubmitted the site plan and elevations for consideration. The original plan consisted of one (1) indoor climate controlled building and three (3) outdoor storage buildings, totaling 129,390 sq. ft. The revised plan consists of one (1) indoor climate controlled building, totaling 124,473 sq. ft. Other changes include, but are not limited to, the relocation of the indoor drive-thru, decreased building height, additional windows and architectural features, and the reduction of wall signs. The revised site layout has also eliminated the need for modifications to the Unified Development Ordinance for side yard setback and the landscape buffer width.
The applicant proposes a preliminary development plan and special use permit for an indoor climate controlled storage facility located east of SE Hamblen Rd on the north side of SE Oldham Pkwy. The property is an infill vacant platted lot zoned CS (Commercial Services District) that was the previous location of an outdoor sales business for manufactured homes.
The facility is comprised of one (1) indoor climate controlled building totaling 669 units. The color palette and materials for the p...

Click here for full text