Title
An ordinance authorizing execution of a Contract in accordance with the City’s On-Call Contract for Repair Services for Water, Wastewater, and Stormwater Infrastructure (Contract 2013-128/4R) with Wiedenmann, Inc. for installation of a leachate cut-off trench at the City’s Resource Recovery Park for a not to exceed cost of $63,681.00, and authorizing the City Manager to enter into an agreement for the same. (PWC 6-19-18)
Body
Issue/Request:
An ordinance authorizing execution of a Contract in accordance with the City’s On-Call Contract for Repair Services for Water, Wastewater, and Stormwater Infrastructure (Contract 2013-128/4R) with Wiedenmann, Inc. for installation of a leachate cut-off trench at the City’s Resource Recovery Park for a not to exceed cost of $63,681.00, and authorizing the City Manager to enter into an agreement for the same.
Key Issues:
- The City has entered into an On-Call contract (Contract 2013-128/4R) with Wiedenmann, Inc. to mitigate failures in buried systems that are causing environmental damage. Time and material rates have been established in the agreement.
- An underground leak has surfaced at Lee’s Summit Landfill.
- The Missouri Department of Natural Resources (MDNR) requires leachate leaks to be fixed in a reasonable timeframe.
- The City worked with SCS Engineers to produce a fix design that is acceptable to MDNR.
Proposed City Council Motion:
First Motion: I move for a second reading of an ordinance authorizing execution of a Contract in accordance with the City’s On-Call Contract for Repair Services for Water, Wastewater, and Stormwater Infrastructure (Contract 2013-128/4R) with Wiedenmann, Inc. for installation of a leachate cut-off trench at the City’s Resource Recovery Park for a not to exceed cost of $63,681.00, and authorizing the City Manager to enter into an agreement for the same.
Second Motion: I move for adoption of an ordin...