File #: BILL NO. 17-140    Name:
Type: Ordinance Status: Passed
File created: 6/1/2017 In control: City Council - Regular Session
On agenda: 7/13/2017 Final action: 7/13/2017
Title: AN ORDINANCE AUTHORIZING THE EXECUTION OF MODIFICATION NO. 6 TO THE AGREEMENT WITH CRAWFORD, MURPHY AND TILLY, INC. FOR ON CALL ENGINEERING SERVICES FOR THE AIRPORT (RFQ 2015-300) IN THE AMOUNT OF $58,630 FOR DESIGN OF BIDDING DOCUMENTS FOR TWO NEW MULTI-UNIT PRE-ENGINEERED T-HANGAR BUILDINGS AND A SINGLE NEW T-HANGAR TAXI LANE AND OTHER INCIDENTAL WORK. (BOAC 6/12/17) (PWC 6/20/17)
Attachments: 1. Ordinance, 2. Modification to On-call Agreement, 3. 2017 Hourly Engineering Fee Estimate
Title
AN ORDINANCE AUTHORIZING THE EXECUTION OF MODIFICATION NO. 6 TO THE AGREEMENT WITH CRAWFORD, MURPHY AND TILLY, INC. FOR ON CALL ENGINEERING SERVICES FOR THE AIRPORT (RFQ 2015-300) IN THE AMOUNT OF $58,630 FOR DESIGN OF BIDDING DOCUMENTS FOR TWO NEW MULTI-UNIT PRE-ENGINEERED T-HANGAR BUILDINGS AND A SINGLE NEW T-HANGAR TAXI LANE AND OTHER INCIDENTAL WORK. (BOAC 6/12/17) (PWC 6/20/17)

Body
Issue/Request:
AN ORDINANCE AUTHORIZING THE EXECUTION OF MODIFICATION NO. 6 TO THE AGREEMENT WITH CRAWFORD, MURPHY AND TILLY, INC. FOR ON CALL ENGINEERING SERVICES FOR THE AIRPORT (RFQ 2015-300) IN THE AMOUNT OF $58,630 FOR DESIGN OF BIDDING DOCUMENTS FOR TWO NEW MULTI-UNIT PRE-ENGINEERED T-HANGAR BUILDINGS AND A SINGLE NEW T-HANGAR TAXILANE AND OTHER INCIDENTAL WORK.

Key Issues:
? This project will provide for replacement of some of the hangars that are scheduled to be removed as part of the Taxiway A project later this fall or spring 1018.
? Topographic Survey
? Geotechnical report for the purpose of designing the taxilane pavements and providing information to the pre-manufactured building manufactures for the purpose of foundation design.
? The development of bidding documents for the procurement of two pre-manufactured t-hangar buildings. Design shall include building layout, elevations, electrical service and performance requirements. The scope does not include the actual building design including foundations, actual sealed design drawings will be required by the contractor.
? Design of all pavements described above including pavement design, typical sections, grades, and material specifications.
? Development of a Construction Safety and Phasing Plan meeting the requirements of FAA AC 150/5370-2F.
? Submittal of 7460 Airspace reviews to FAA for the new buildings.