Title
Public Hearing: Application #PL2022-357 - Rezoning from RP-2 to CP-2 and Preliminary Development Plan - Take 5 Oil Change, 400 NE M-291 Highway; Driven Assets, LLC, applicant.
(Note: This application was continued from November 21, 2023 and May 7, 2021 per the applicant's request.)
Body
Issue/Request:
The applicant seeks approval of a rezoning from RP-2 to CP-2 and approval of a preliminary development plan (PDP) to construct a 1,415 sq. ft. oil change facility. From an architectural perspective, the exterior materials will include EIFS/stucco, cultured stone and glass.
The applicant is seeking a modification to the design of the required landscaping buffer.
Proposed Motion:
I mover to recommend approval of Application #PL2022-357 - Rezoning from RP-2 to CP-2 and Preliminary Development Plan - Take 5 Oil Change, 400 NE M-291 Highway; Driven Assets, LLC, applicant.
Presenter
Todd Minnis, Applicant’s Representative
C. Shannon McGuire, Senior Planner
Recommendation
With the conditions of approval below and as outlined in the staff letter, the application meets the goals of the Ignite! Comprehensive Plan, and requirements of the UDO and Design and Construction Manual (DCM).
1. A modification shall be granted to allow the required six-foot high masonry wall or opaque vinyl fence for the high impact buffer requirement be installed adjacent to the retaining wall in the location as depicted on the site plan sheet C-1 dated September 8, 2023.
2. Development shall be in accordance with the preliminary development plan dated September 8, 2023, and the elevations dated August 11, 2020.
Committee Recommendation
A motion was made by Board Member Jana-Ford, seconded by Board Member Rader, that this application be recommended for approval to the City Council - Regular Session. The motion carried unanimously.