Title
An Ordinance authorizing the execution of Addendum No. 6 to an agreement by and between the City of Lee’s Summit, Missouri and Olsson Associates Engineering, Inc. for the services related to site remediation and High Service Pump Station fuel tank design at the old water operations facility in the amount of $60,320 and authorizing the City Manager to enter into the same. (PWC 11/27/18)
Body
Issue/Request:
Award of an engineering design contract for undergroung storage tank removal and emegency generator fuel tank design.
Key Issues:
? The City would like to prepare the old Water Operations Site for redevelopment
? Water Utilities needed to remove existing operational equipment prior allowing the site to be redeveloped
? The site also houses High Service Pump Station which is most active of the City’s three large water pumping facilities
? High Service Pump Station will remain after this site is redeveloped
? High Service Pump Station has a large emergency diesel generator attached to it
? The fueling system for the High Service generator will need to be modified prior to site redevelopment
? Olsson Associates performed a study which recommended removal of the underground fuel storage tank and replacement with an aboveground fuel storage tank
Proposed City Council Motion:
FIRST MOTION: I move for a second reading of an Ordinance authorizing the execution of Addendum No. 6 to an agreement by and between the City of Lee’s Summit, Missouri and Olsson Associates Engineering, Inc. for the services related to site remediation and High Service Pump Station fuel tank design at the old water operations facility in the amount of $60,320 and authorizing the City Manager to enter into the same.
SECOND MOTION: I move for adoption of of an Ordinance authorizing the execution of Addendum No. 6 to an agreement by and between t...